Skip to content

OEM / ODM

Your brand on a platform we already hold

Housing colour, plug set, marks and firmware strings from 500 units. A new product from a brief in twelve weeks, with certification running beside tooling.

OEM from

500 units

ODM from

12 weeks

Sample

18–28 days

Owner

One engineer on the thread

How we work with you

Three commercial shapes, one factory

01

OEM

Your brand on our platforms. Housing colour, packaging, plug set, printed or moulded branding, and firmware strings — all specifiable without new tooling.

From 500 units

02

ODM

A new product from a brief. Industrial design, electronics, firmware, tooling and certification run as one programme with a single project owner.

From 12 weeks

03

Private label

Existing SKUs relabelled and re-boxed for your channel, with your certificates listed under your entity where required.

From 1,000 units

The floor

Engineering sits two floors above the line

A firmware change and a process change still happen in one conversation. That is the point of not splitting design to a trading desk.

  • 45 electronics engineers, firmware included.
  • 14 lines, 18,400 m², 900,000 units a month.
  • Certificates issued to OmniTech, not a middle company.
OmniTech assembly line

Programme

Brief to container, without a silent month

  1. 01

    Brief

    Port map, wattage, housing envelope, plug set, certificate holder and brand marks. We will send back the gaps rather than guess them.

    3–5 days

  2. 02

    Engineering sample

    A board from the library or a fork, firmware, and a housing you can plug in. EMC pre-scan happens before the courier leaves Bao’an.

    18–28 days

  3. 03

    Tooling and DFM

    Steel, colour, printed or moulded marks. Cosmetic and thermal samples can run on different dates if the programme needs it.

    4–8 weeks

  4. 04

    Certification

    Files already in our name transfer with the SKU. A new family or a certificate in your entity is scheduled beside tooling, not after the PO.

    In parallel

  5. 05

    Mass production

    Fourteen lines, 900,000 units a month, AQL 0.65. One project owner from the brief through the first container.

    30–45 days after golden

Start a programme

Send the brief. A sales engineer replies in one day.

Request a Quote